We supplied and installed framing timbers under the track to support the timber matting, which was secured to the framing with cam screws.
This Road Rail Access Point was a temporary access solution, which was removed at the end of the permanent contract works. |
|
The works involved the clearance of the area where the Road Rail Access Point was to be installed. |